New design revealed for Tipperary Town’s historic The Plan town park

A design for The Plan in Tipperary Townplaceholder image
A design for The Plan in Tipperary Town | courtesy of Drake Hourigan Architects

The Plan was last refurbished in the 1960s; the recent redesign includes moving the historic postbox, including safer pedestrian crossing points on the road, and including a ground-level water feature with jets for kids.

Plans for the redesign of The Plan in Tipperary Town have been published by the Council, including the refurbishment of the iconic bandstand, repairs to the boundary walls and railings, and the replacement of the boundary wall on Davitt Street with a new raised planted bed.

The park has an interesting history; on the outskirts of the town, it was built during the ‘Plan of Campaign’, when tenants of AH Smith Barry abandoned their shops on the main street and endeavoured to establish a ‘New Tipperary’ outside of Smith Barry’s control.

Previously, The Plan was home to a weighing station, and a forge. It was reconstructed in the 1960’s when it was re-named ’The Plan’, which refers to the ‘Plan of Campaign’.

Work at The Plan in the 1960splaceholder image
Work at The Plan in the 1960s | courtesy of Drake Hourigan Architects

The new design includes a redesign of the layout of the park and the paths, as well as repair of the bandstand. There will be a new accessible ramp, and a water feature on the ground with jets for kids.

New specimen tree planting is inclued, as is perennial and shrub planting, lawn areas and native wildflower meadow in selected locations. The existing historic cast iron benches will be refubished, along with new seating, furniture, pathway lighting and feature lighting.

The Council also plans to move the historic postbox, and include improved pedestrian crossings at Emmet Street and Redmond Square. A road safety audit found that it was ‘unclear’ where pedestrians are meant to cross the road in these areas, and so the raised crossing should be moved.

The plans are open to public consultation, and can be viewed online or at the Council’s offices in Thurles, Nenagh, and Clonmel. Submissions are open until January 19th.

Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice